The most common failure in work instruction programs is not technology. It is document type confusion. Manufacturers try to use one document for four different purposes, then wonder why operators ignore it.
An SOP is not a work instruction. If your work instruction is three pages long and covers four different roles, it is an SOP, and operators will not use it. You have documented your process for auditors, not for the people doing the work.
A work instruction specifies what should happen. The AS BUILT record captures what did happen, including deviations from the instruction, the sequence decisions made in the field, and who made them.
For complex assemblies and engineered-to-order manufacturers, the AS BUILT record is not a nice-to-have. It is the auditable proof that what left your facility matches what was designed, approved, and traceable back to the specific operator, the specific revision, and the specific decision points.
BSH traces warranty claims back through AS BUILT records to identify root cause at the component and assembly level. Bühler, which engineers and builds custom capital equipment to order, uses AS BUILT records to confirm that every unit shipped matches its engineering specification. In both cases, paper cannot produce a reliable AS BUILT record without a dedicated role whose job is transcribing what happened on the floor into a spreadsheet or database. Every manual re-entry step is an opportunity for the record to diverge from reality.